Indianapolis to Construct Combined Sewer Overflow Tunnel

September 19, 2013

Parsons Brinckerhoff will design the new CSO tunnel

Indianapolis CSO Tunnel Parsons Brinckerhoff

Citizens Energy Group has selected Parsons Brinckerhoff to design a new combined sewer overflow (CSO) tunnel in downtown Indianapolis.

The Lower Pogues Run Tunnel Project is one of five major components of a federally mandated 25-mile, deep-rock storage tunnel system, referred to as Dig Indy, intended to capture and convey CSO for treatment at the Southport wastewater treatment plant in Indianapolis. The Lower Pogues Run Tunnel Project includes approximately 2 miles of 18-ft finished diameter deep-rock tunnel that will receive flows from six existing primary CSO outfall structures in downtown Indianapolis. Parsons Brinckerhoff is responsible for preparation of an advanced facility plan and detailed design of the tunnel project. The advanced facility plan report is expected to be completed by the end of 2013. Detailed design is scheduled for completion by the end of 2015 with construction slated for completion in 2021.

Source: 
Parsons Brinckerhoff

Leave A Comment

  • Web page addresses and e-mail addresses turn into links automatically.
  • Allowed HTML tags: <a> <em> <strong> <cite> <code> <ul> <ol> <li> <dl> <dt> <dd>
  • Lines and paragraphs break automatically.

More information about formatting options

Type the characters you see in this picture. (verify using audio)
Type the characters you see in the picture above; if you can't read them, submit the form and a new image will be generated. Not case sensitive.

Poll

SWS wants your input on our email newsletters: Detailed weekly news summary, or brief daily news update?: