2022 Top Projects | Englesby Brook 08 Pond CMAC Retrofit

Dec. 12, 2022
To improve stream health in Englesby Brook, the City of Burlington Department of Public Works planned a number of stormwater projects, including the retrofit of a stormwater basin called “08 Pond."

Dayton Marchese, account executive for Opti and James Sherrard, stormwater program manager for the City of Burlington, drop by to discuss another one of the 2022 Top Projects, the Englesby Brook 08 Pond CMAC Retrofit.To improve stream health in Englesby Brook, the City of Burlington Department of Public Works planned a number of stormwater projects. One project was the retrofit of a stormwater basin called “08 Pond”, a wet detention pond collecting runoff from 131.5 acres. 

To read the full press release on this year’s Top Projects, click here.    

More 2022 Top Projects videos:  

2022 Top Projects | Memorial Park Land Bridge & Prairie      

2022 Top Projects | South Jensen Stormwater Retrofit 

2022 Top Projects | Cincinnati Metropolitan Sewer District Lick Run Greenway #224 

2022 Top Projects | Watershed 1-18A and 1-17 

About the Author

Katie Johns

Katie Johns, editor-in-chief of Storm Water Solutions and Water Quality Products, graduated from the University of Missouri in 2016 with a Bachelor of Journalism and a Bachelor of Arts in Spanish. Johns joined the Storm Water Solutions team in September 2019. Johns also helps plan the annual StormCon conference and co-hosts the Talking Under Water podcast. Prior to entering the B2B industry, she worked as a newspaper reporter and editor in Sarasota, Florida, and a magazine assistant editor in the Chicago suburbs. She can be reached at [email protected].